Migration Economics and TCO
Understand source run rate, target run rate, transition cost, TCO and payback.
CoreFinOps models the financial case for a workload migration in explicit currency using exact decimal arithmetic. The model should preserve both user inputs and derived outputs so the decision can be reproduced.
Primary figures
- Current source run rate: recurring legacy cost on the modeled basis.
- Target AWS run rate: projected future operating cost after transition.
- Transition cost: one-time project, migration and other supported transition expense.
- Dual-run cost: temporary overlap while old and new environments remain operational.
- 1-year / 3-year TCO: comparable total modeled cost over the stated horizon.
- Monthly saving and payback: scenario outputs, not guaranteed billing outcomes.
Assumptions and confidence
An AWS rate estimate and a customer-provided legacy support contract should have different provenance. Unknown licensing, shared-service attribution or target sizing may warrant sensitivity ranges instead of a single false-precision number.
Important
Comparison rules
Compare the same currency, period and cost basis. Do not add USD and EUR without an approved exchange-rate model. Do not treat an estimated post-migration run rate as observed AWS spend.
After migration
The model provides the planned benchmark. Dual-run, decommission and subsequent value verification establish what actually happened. If actual evidence contradicts the model, record the difference without rewriting the original approved decision case.